Pioltello logistics centre

Goodman Pioltello Logistics Centre
Pioltello logistics centre

Via 1° Maggio, Pioltello, Milan, 20096, Italy

Total size:
Property type: Land for development
Available date: Available now

Parking
ESFR sprinklers
Hybrid car parking
Secure site access
Truck parking
Solar panels
Staff social areas

Great and unique opportunity in the gateway city of Milan.

Located in East of Milan, Goodman Pioltello logistics centre is designed as a last generation warehouse in a prime logistics market, as  Milan region is considered as the main and largest logistics market in Italy.

The logistics centre benefits to an incomparable accessibility  thanks to its proximity to the city, close to the Linate airport and Milan East inner ring-road, and excellent inter-connectivity to three main motorways in Northern Italy. From the logistics centre 6.6 m inhabitants are reachable in 1 hour truck driving time.

Also given its outstanding features this property is suitable for both a standard or last-mile logistics.

With its interior and exterior architecture and its specifications for the well being of the employees, the logistic centre could also host a head office.

 

Main benefits

+ Flexible solution 

+ 850 m to SP 14 and 1.1km to SP 103

+ 750 m to Public train station

+ 3 km to Rail Cargo Terminal

+ 6.9 km to Linate airport

 

Technical specifications

Warehouse

+ New generation buildings

+ 20 Autodocks (1/870 m2)

+ Free height from 11 m and maximum storage height up to 12.20 m

+ Floor: load capacity 5 t/m2

+ ESFR sprinkler type

 

Sustainability features

In Goodman we measure our sustainability engagement by certificating our assets through BREEAM (or equivalent) with a minimum targeted level Very Good.
Pioltello Logistics Centre will have its sustainable features upgraded for a better working environment of the futures employees and to minimize the footprint and carbon emission, that will lead to the certification BREEAM Excellent.

+ Breeam Excellent certification targeted

+ Solar panel (providing in a first estimation 50 kWp)

+ Roof and façade with 10 cm rockwool for better insulation

+ Energy tracker system

+ Minimum of 4EV charging points

Building specs and design driven by Life Cycle Cost analysis

Minimum of 4 EV charging points

Sustainable management of the waste material during the construction phase

+ Use of recycled and secondary aggregates, thereby reducing the demand for virgin material and optimizing material efficiency in construction

+ Construction materials environmental friendly (VOC free, etc.)

+ Increased acoustic performance of the building

 

Office

+ Free height: 2,70 m

+ AirCo system

+ LED lighting system + motion sensors

Energetic Performance Certificate grade A

 

Outside

2.800 m² of greenery area

Social area to take a break

Smoking corner

Fence

+ Guard house

Covered bicycle parking

+ Cars and trucks parking lots