Pioltello logistics centre

Via 1° Maggio, Pioltello, Milan, 20096, Italy
Located in East of Milan, Goodman Pioltello logistics centre is designed as a last generation warehouse in a prime logistics market, as Milan region is considered as the main and largest logistics market in Italy.
The logistics centre benefits to an incomparable accessibility thanks to its proximity to the city, close to the Linate airport and Milan East inner ring-road, and excellent inter-connectivity to three main motorways in Northern Italy. From the logistics centre 6.6 m inhabitants are reachable in 1 hour truck driving time.
Also given its outstanding features this property is suitable for both a standard or last-mile logistics.
With its interior and exterior architecture and its specifications for the well being of the employees, the logistic centre could also host a head office.
Main benefits
- Flexible solution
- 850 m to SP 14 and 1.1km to SP 103
- 750 m to Public train station
- 3 km to Rail Cargo Terminal
- 6.9 km to Linate airport
Technical specifications
Warehouse
- New generation buildings
- 20 Autodocks (1/870 m2)
- Free height from 11 m and maximum storage height up to 12.20 m
- Floor: load capacity 5 t/m2
- ESFR sprinkler type
Sustainability features
In Goodman we measure our sustainability engagement by certificating our assets through BREEAM (or equivalent) with a minimum targeted level Very Good.
Pioltello Logistics Centre will have its sustainable features upgraded for a better working environment of the futures employees and to minimize the footprint and carbon emission, that will lead to the certification BREEAM Excellent.
- Breeam Excellent certification targeted
- Solar panel (providing in a first estimation 50 kWp)
- Roof and façade with 10 cm rockwool for better insulation
- Energy tracker system
- Minimum of 4EV charging points
- Building specs and design driven by Life Cycle Cost analysis
- Minimum of 4 EV charging points
- Sustainable management of the waste material during the construction phase
- Use of recycled and secondary aggregates, thereby reducing the demand for virgin material and optimizing material efficiency in construction
- Construction materials environmental friendly (VOC free, etc.)
- Increased acoustic performance of the building
Office
- Free height: 2,70 m
- AirCo system
- LED lighting system + motion sensors
- Energetic Performance Certificate grade A
Outside
- 2.800 m² of greenery area
- Staff social area
- Fence
- Guard house
- Covered bicycle parking
- Cars and trucks parking lots